Azeri-Central-East (ACE)
Azeri-Central-East (ACE)
Azeri-Central-East (ACE)

The purpose of the project:
As part of the Azeri-Central-Eastern project, we installed a new 48-shaft production, drilling, and living platform at a depth of approximately 140 meters, positioned between the existing “Central Azeri” and “Eastern Azeri” platforms.
Our role:
Since 2019, we have taken charge of the primary construction, installation, marine, and underwater operations for this project. Our supply efforts encompassed a wide range of products, including steel, sandblasting materials, electrical components, PVC materials, generators, profile welding technology, fire protection systems, personal protective equipment, hand tools, and fasteners, supporting both construction and repair activities. Moreover, we successfully equipped a significant quantity of IT equipment and software. In the second phase of the marine and underwater operations, we diligently provided hydraulic piping systems, spare parts, pipe profile cutting services, valves, fittings, compressors, anti-corrosion paints, technical insulation materials, and other essential resources as per project requirements.

The purpose of the project:
As part of the Azeri-Central-Eastern project, we installed a new 48-shaft production, drilling, and living platform at a depth of approximately 140 meters, positioned between the existing “Central Azeri” and “Eastern Azeri” platforms.
Our role:
Since 2019, we have taken charge of the primary construction, installation, marine, and underwater operations for this project. Our supply efforts encompassed a wide range of products, including steel, sandblasting materials, electrical components, PVC materials, generators, profile welding technology, fire protection systems, personal protective equipment, hand tools, and fasteners, supporting both construction and repair activities. Moreover, we successfully equipped a significant quantity of IT equipment and software. In the second phase of the marine and underwater operations, we diligently provided hydraulic piping systems, spare parts, pipe profile cutting services, valves, fittings, compressors, anti-corrosion paints, technical insulation materials, and other essential resources as per project requirements.

The purpose of the project:
As part of the Azeri-Central-Eastern project, we installed a new 48-shaft production, drilling, and living platform at a depth of approximately 140 meters, positioned between the existing “Central Azeri” and “Eastern Azeri” platforms.
Our role:
Since 2019, we have taken charge of the primary construction, installation, marine, and underwater operations for this project. Our supply efforts encompassed a wide range of products, including steel, sandblasting materials, electrical components, PVC materials, generators, profile welding technology, fire protection systems, personal protective equipment, hand tools, and fasteners, supporting both construction and repair activities. Moreover, we successfully equipped a significant quantity of IT equipment and software. In the second phase of the marine and underwater operations, we diligently provided hydraulic piping systems, spare parts, pipe profile cutting services, valves, fittings, compressors, anti-corrosion paints, technical insulation materials, and other essential resources as per project requirements.